This is our record of Amazon price changes for 20pcs 22uF 450V Axial Electrolytic Polarized Capacitors with Long Leads Electronic component Tube Amplifier (B07FF794XV) since we began monitoring it.
| Price Type | Lowest Ever | Highest Ever | Current + | Average |
|---|---|---|---|---|
| Amazon | (Jul 02, 2026) | (Jul 02, 2026) | 0,00 € (Jul 02, 2026) |
Amazon Price
Jul 02, 2026 09:23 AM
We'll notify you when the price drops to your desired price.